Project Overview

This project was delivered for a long-material warehouse in Poland, designed for the storage and automated handling of steel profiles and industrial long goods.

The system combines cantilever storage racks and beam racks with stacker crane and conveyor integration, providing an efficient solution for long material warehousing.

Project Specifications

Dongjian Cantilever AS/RS Project for Long Material Warehouse in Poland
  • Location: Poland
  • Industry: Industrial Materials / Metal Processing
  • Warehouse Area: 550 m²
  • System Type: Cantilever AS/RS
  • Racking Height: 7 m
  • Storage Levels: 5–10 levels
  • Total Storage Positions: 162
  • Max Load Capacity: 1.5 tons per position

Customer Challenge

The customer faced several challenges in storing oversized long materials:

  • 6-meter long products requiring specialized storage
  • Heavy unit loads up to 1.5 tons
  • Need for automated infeed and outfeed
  • Limited warehouse footprint
  • Requirement for stable and safe long-goods handling

Traditional floor stacking resulted in low space utilization and difficult material retrieval.

Our Solution

We designed a hybrid cantilever AS/RS system combining cantilever racks and beam racks.

Storage Configuration

Cantilever Section

  • L6000 × D800 × H6900
  • 8-arm levels
  • 10 sets
  • 4 arms per level
  • 1,500 kg load capacity
  • L3300 × D800 × H6900
  • 5-arm levels
  • 8 sets
  • 3 arms per level
  • 1,500 kg load capacity

Beam Rack Section

  • L6350 × D800 × H6900
  • 5 beam levels
  • 5 sets
  • 1,500 kg + reinforced base beam
  • L3700 × D800 × H6900
  • 3 beam levels
  • 7 sets
  • 1,500 kg + reinforced base beam

Material Specifications

Dongjian Cantilever AS/RS Project for Long Material Warehouse in Poland

Stored goods include:

  • 3300 × 800 × 700 mm
  • 6000 × 800 × 300 mm

Among them:

  • 95 positions dedicated to 6000 mm long materials

Automated Handling Desig

Long materials are stored on the cantilever side.

For inbound and outbound operations:

  • stacker crane handling
  • bottom beam conveyor line transfer
  • automated transport in and out

This design significantly improves handling efficiency and reduces manual labor.

Key Project Highlights

  • Specialized storage for 6-meter long goods
  • Hybrid cantilever + beam rack structure
  • 1.5-ton heavy-duty load capacity
  • Integrated stacker crane and conveyor line
  • High-density vertical storage

Results & Operational Valu

After implementation, the warehouse achieved:

  • improved storage density
  • safer long-goods handling
  • automated inbound / outbound flow
  • reduced floor stacking risks

The system now supports stable industrial material operations.

Why This Project Matters

This project demonstrates our capability in delivering cantilever AS/RS solutions for long industrial materials, especially where both load capacity and automated handling are critical.

The hybrid structure allows customers to balance storage flexibility and automation efficiency.

Recent Blog

Optimize Your Storage System

Request a quick quote for racking solutions.
We reply within 24 hours.

Get Warehouse Racking Solutions

Fast quote for pallet, shuttle, AS/RS & customized racks.